We were appointed to deliver the new inlet works package for the Loggerheads WWTP.
This comprised a new stainless-steel reception tank where the forwarded flows from Village TPS would be blended with the current Sanatorium flows before passing through inlet screens.
The inlet works package included:
Two FINEGUARD™ screens (duty/standby) sized for a 700mm wide x 1000mm deep channel, with each capable of screening 81 l/s.
A 7m screw conveyor capable of handling <3.0m3/hr.
Two SPIROWASH® screenings washing units, each capable of handling up to 2.5m3/hr volume. The units receive screenings from the screw conveyor and clean, dewater and compact the screenings, before discharging via press tubes into a skip.
Support structure for the packaged inlet works installed on dedicated concrete pad.